MAKE MORE OF YOUR EVERYDAY

Bathroom renovations.
A little everyday luxury.

A bathroom that works better and feels better. Bring your ideas for fixtures, tile, walls and finishes together in one carefully defined renovation.

COQUITLAM BASED • SERVING THE LOWER MAINLAND

Renovated bathroom with vanity, mirror and glass shower
ALPHA & OMEGACare, from beginning to end.
Family-ownedWritten, itemized estimatesCoquitlam based · Lower Mainland service

THE SCOPE, CLEARLY DEFINED

Start with how you
want the room to feel.

More storage, a different shower, or a fresh finish throughout: a bathroom renovation starts with your priorities. Alpha & Omega works with homeowners across the Lower Mainland from our Coquitlam base, reviewing the existing room and defining the work before the renovation begins.

What we can help with

YOUR PROPERTY. YOUR PRIORITIES.
01

Showers & bathing areas

Discuss the shower or tub, surrounding finishes and any layout changes. Existing conditions and related work need to be reviewed together.

02

Vanities & fixtures

Vanities, sinks, counters and toilets can be included in your scope. Identify what stays, what changes and which connections need attention.

03

Walls, floors & finishes

Tile, flooring, drywall and painting complete the room. Coordinate these selections with the preparation and installation stages.

PLANNING YOUR BATHROOM RENOVATIONS

Separate a cosmetic update from a full bathroom renovation.

A new vanity and fresh paint can be a different project from changing the shower, moving fixtures or rebuilding damaged surfaces. Start with what is not working in the room: storage, access, layout, worn finishes or an underlying defect. Those priorities should shape the scope before products are ordered.

01

Decide what stays and what moves

List the fixtures and finishes being retained, replaced or relocated. Layout changes can affect plumbing, electrical and other building work. Identify the qualified trades, design work and any approvals required for the proposed changes before agreeing the construction sequence.

02

Look beneath the visible finish

Share any leak history, damaged grout, soft surfaces or ventilation concerns. A decorative finish does not resolve an underlying water-management problem. Shower and wet-area construction, preparation and finish materials need to be considered as a system and clearly defined in the scope.

03

Plan selections and household access

Confirm dimensions and compatibility for the vanity, fixtures, doors and finishes before ordering. Tell the team if this is the only bathroom or if accessibility needs affect the plan. Delivery dates, the order of work and time before surfaces can be used all influence the programme.

COMPARE THE SCOPE

Bathroom renovations: what to include.

Different parts of the work to discuss in your estimate
Project areaWhat needs assessmentWhat to agree
Finish-focused refreshRetained layout and sound existing surfacesAgreed fixtures, surface preparation and decorative finishes.
Shower or bathing-area changesExisting construction, water management and selected fixturesA defined assembly and installation scope, not tile alone.
Layout or wider renovationConnections, building systems, design and approvalsA coordinated plan with responsibilities and exclusions stated.

COST & SCOPE

What affects your bathroom renovations estimate?

The amount of removal, hidden-condition repairs, fixture selections and any changes to connections affect the total. Ask for allowances and owner-supplied items to be clear. A contingency is not the same as approved additional work; agree on how discoveries and scope changes will be assessed and authorized.

Request a free estimate ↗

COMPLETION & AFTERCARE

At handover.
And after the work.

Review the installed fixtures, finishes and agreed functional checks with the team. Keep product instructions and care guidance, especially for surfaces that need a waiting period before use or cleaning. Record any outstanding work and obtain relevant documentation for the completed scope.

BEFORE YOU ORDER

Keep. Replace. Move.
Decide in that order.

Make three lists for the bathroom before ordering fixtures. Keeping a layout, replacing a fixture in place and moving its connections create different coordination needs. Show the estimate team which decision applies to each item.

  • Keep: identify the bath, vanity, tile, flooring or accessories to protect and retain.
  • Replace: supply dimensions and product information, plus who orders and receives each item.
  • Move: flag proposed fixture or doorway changes for assessment and related-trade planning.
  • Access: say whether this is the only bathroom and agree arrangements before a work period is confirmed.
Tell us about your project

FROM BEGINNING TO END

Good work.
A clear way forward.

Know what is included, how the work is planned, and what happens next.

01

Talk through priorities

Review the existing bathroom and your ideas.

02

Define the renovation

Agree on the work, selections and project boundaries.

03

Coordinate the stages

Sequence removal, repairs, installation and finishing.

04

Review the completed room

Check the agreed fixtures and finishes together.

BEFORE WE BEGIN

Your questions,
considered.

A few useful details about bathroom renovations.

Can you refresh a bathroom without changing the layout?

Yes. A finish-focused update can be discussed separately from a full layout change. The condition of the room and your chosen fixtures will shape the work.

Can accessibility be considered?

Yes. Share your access and mobility requirements at the start so the proposed layout and fixture choices can be assessed against them.

Can painting and drywall be included?

Yes. Drywall, wall preparation and painting can be included with the renovation and should be clearly identified in the estimate.

Can I supply my own fixtures?

Discuss this before purchasing. Dimensions, compatibility, delivery dates and responsibility for missing or damaged items need agreement. An estimate should identify which products are owner-supplied and which are included.

Can you promise a fixed completion time before seeing the bathroom?

The room, scope, materials and any underlying issues need review first. Product availability, related trades and drying or curing stages can affect the programme. Agree on a realistic schedule and the process for communicating changes.

Is new tile enough to solve a leaking shower?

Do not treat a tile replacement as a diagnosis or a complete water-management repair. Share the leak history and available records so the underlying issue and wet-area assembly can be assessed. The corrective work and responsible trades need to be identified before new finishes conceal the area.

LOCAL ROOTS. REACHING FURTHER.

From Coquitlam.
Across the Lower Mainland.

Our team is based at 62 Fawcett Road #2 in Coquitlam. We serve the Tri-Cities, Metro Vancouver and the Fraser Valley. Tell us where your property is and we’ll discuss the scope and timing.

Explore our service area

THE PEOPLE BEHIND THE KIND WORDS

Good work.
Real reassurance.

Read our reviews on Google
GoogleExcellent★★★★★

Based on 52 reviews

Review snapshot · 1 October 2026

Norine Yamamoto

Google review
★★★★★
“I am so grateful for A&O’s help, from start to finish.”
An excerpt from their review

melanie tsuyuki

Google review
★★★★★
“They have painted my entire house inside and out”
An excerpt from their review

YOUR NEXT CHAPTER

Let’s make
something
beautiful.

Tell us a little about your project.
We’ll help you take the next step.

604 330 7476

Request a free estimate

No measurements needed. Your name, email and city are all we need to start; other details are optional.

A sentence about what you would like to change is enough. No measurements or selected colours needed.

Add a phone number or preferred timing (optional)

Next: review your message and open it in your email app to send. Nothing is sent automatically.

How we handle your information

ONE LAST LOOK

Your project,
ready to share.

Nothing has been sent yet. Open the draft below in your email app, then send it to our team.

Open my email draft

No email app set up? Call 604 330 7476 or email admin@alphaomegapainting.ca.